Article
Publication date: 10 November 2020

Muhammad Irfan, Muhammad Jamaluddin Thaheem, Syyed Sami Ul Haq Kaka Khel, Muhammad Faizan Ul Haq, Muhammad Saeed Zafar and Muhammad Ehtsham

The purpose of this research is to determine a comprehensive coursework for teaching quality management in the universities of developing countries i.e. Pakistan pertinent to the…

Abstract

Purpose

The purpose of this research is to determine a comprehensive coursework for teaching quality management in the universities of developing countries i.e. Pakistan pertinent to the construction industry. Additionally, a framework was also developed based on the results.

Design/methodology/approach

Factors and course contents of quality management are extracted through a content analysis of the published literature. Further, a questionnaire survey is conducted involving 150 professionals to assess the requirements of the industry and academic professionals of the construction industry for effective quality management. Finally, for getting a more objective perspective, using quality function deployment (QFD) matrix a framework is developed.

Findings

The results show the level of importance of each design requirement. We can identify the design requirements through which we can fulfill the needs and demands of the stakeholders. Contents like benchmarking, supply chain management, six sigma and other data analysis methods, costing and auditing of quality, customer satisfaction analysis, TQM: theory and practices and ISO certification processes and procedures should be included in any course program related to quality management pertinent to the construction industry. Along with these contents, workshops and seminars must be arranged to address the user requirement for increased leadership and communication skills.

Originality/value

There is a lack of literature available on course content for quality management in the universities for the construction sector, therefore, a huge scope of future research in the field of quality management in the construction industry needs to be investigated. This research highlights the most significant quality management factors and course contents as per the requirement of industry professionals. Therefore, this study adds to the existing body of knowledge by developing a robust framework that will help decision-makers and top management to develop constructive quality management course work at university level that will help in producing qualified and trained quality professionals to the construction industry.

Details

The TQM Journal, vol. 33 no. 6
Type: Research Article
ISSN: 1754-2731

Keywords

Article
Publication date: 15 April 2020

Ahsen Maqsoom, Muhammad Hamad, Hassan Ashraf, Muhammad Jamaluddin Thaheem and Muhammad Umer

Despite the efforts of project managers and the widespread use of project management methodologies, most of the projects remain unfulfilling in terms of delivering targeted…

Abstract

Purpose

Despite the efforts of project managers and the widespread use of project management methodologies, most of the projects remain unfulfilling in terms of delivering targeted performance. This for most part can be attributed to the inability of an organization to implement control mechanisms and ineffective management of complexity risk. Keeping in view the aforementioned problem, the objective of this study is to investigate the association between control modes and project performance. Moreover, this study also examines the moderating role of complexity risk on the association among various control modes and project performance.

Design/methodology/approach

The data were collected from 171 construction projects through a postal questionnaire survey. Partial least squares structural equation modeling was utilized for testing the hypothesized relationships of the research model.

Findings

This study found significant positive relation between formal and informal control mechanisms and project performance. It is found that complexity risk significantly moderates the relationship between control modes and project performance. The results indicate that complexity risk positively moderates the relationship between outcome control and clan control with project performance. Furthermore, complexity risks negatively moderates the relationship between behavior control and project performance. However, the association between self-control and project performance is found insignificant in the presence of complexity risk.

Originality/value

This study is the first attempt to study the relationship of control mechanisms, complexity risk and project performance in the construction industry.

Details

Engineering, Construction and Architectural Management, vol. 27 no. 9
Type: Research Article
ISSN: 0969-9988

Keywords

Article
Publication date: 18 July 2019

Muhammad Irfan, Muhammad Jamaluddin Thaheem, Hamza Farooq Gabriel, Muhammad Sohail Anwar Malik and Abdur Rehman Nasir

The purpose of this research is to quantify the effect of stakeholder conflicts on project constraints in the construction industry using ordinal regression analysis. For this…

2021

Abstract

Purpose

The purpose of this research is to quantify the effect of stakeholder conflicts on project constraints in the construction industry using ordinal regression analysis. For this purpose, the most significant project constraints and factors that cause stakeholder conflicts found in the literature are measured.

Design/methodology/approach

Factors causing stakeholder conflicts and project constraints are extracted through a content analysis of the published literature. Further, a questionnaire survey is conducted involving 170 professionals to assess the effect of conflicts on project constraints. Finally, to obtain a more objective assessment, a statistical model is developed, and to highlight the most severe factors causing conflict and impacting project constraints, ordinal regression analysis is performed.

Findings

The results show that in the construction industry, all project constraints are affected by stakeholder conflicts. Factors that result in stakeholder conflicts indicated a positive relationship with cost, time and resources. This means that any increase or decrease in the effect of stakeholder conflicts will directly influence these three project constraints. Similarly, a negative relationship was observed between stakeholder conflicts and quality, workforce productivity, protection of environment and safety regulations in the construction industry, indicating that increase in the effect of stakeholder conflicts will decrease these four project constraints and vice versa. The results for cumulative ordinal regression model highlight that lack of communication, poor quality of completed works and change orders and rework have intense effects on project constraints collectively.

Originality/value

A small number of studies have been undertaken to examine the emergence of project constraints in the developing countries. And even more, its relationship with stakeholder conflicts in the construction industry is limited. This research highlights the most significant project constraints and factors that result in stakeholder conflicts in the construction industry. Therefore, this study adds to the existing body of knowledge by developing an ordinal regression model that will help decision-makers and top management control this enigma of stakeholder conflicts in the construction industry.

Details

International Journal of Conflict Management, vol. 30 no. 4
Type: Research Article
ISSN: 1044-4068

Keywords

Article
Publication date: 1 March 2022

Muhammad Usman Shahid, Muhammad Jamaluddin Thaheem and Husnain Arshad

The construction industry struggles in environmental and economic performance due to waste generation. Several studies have measured this waste in the construction industry of…

Abstract

Purpose

The construction industry struggles in environmental and economic performance due to waste generation. Several studies have measured this waste in the construction industry of developing countries like India, Brazil, China, Nigeria and Iran, and proposed strategies to enhance the overall efficiency. But no such work exists in Pakistan's context. The construction industry of Pakistan contributes significantly to the country's gross domestic product (GDP). And with several mega projects in progress to overcome the energy crises and improve the infrastructure of the country, the absence of proper waste management policies and plans calls for empirical research. Therefore, this study quantifies and benchmarks material waste in the local context, its impact on project cost and the effect of multiple subcontracting arrangements on waste generation. It also proposes a conceptual waste management plan (WMP) for local conditions which can be generalized for developing countries.

Design/methodology/approach

This paper uses a mixed research approach by leveraging Saunders's research onion model. To benchmark the current wastage practices, quantitative data of material waste in the Pakistani construction industry are gathered through document review of accounting systems, inventory and payment records of 40 completed building projects. Using the data, the waste rate of different materials is measured along with their impact on cost. Additionally, the role of subcontracting arrangements in waste generation is also investigated. Also, semi-structured interviews are conducted with project managers of high- and low-performing construction organizations to propose a conceptual WMP for the local industry and developing countries.

Findings

The highest wasteful materials by quantity are wood, sand and concrete blocks, and those by cost are wood, bricks and steel. By quantity, 123% more material was used on average than the actual productive work. Also, the labor only (L-O) subcontracting arrangement causes maximum waste. Moreover, the difference between the highest (155%) and lowest wasting company (104%) is 51%, highlighting the proactive and resistive waste management culture and approach by the worst- and best-performing companies. Further, the impact of waste quantities is more than 2% of the project cost. Finally, a conceptual model consisting of measures at the project, industry and national levels is also proposed as a guide for developing countries.

Practical implications

The findings of this benchmarking study can help improve the project planning, execution and monitoring, and control practices by providing a better understanding of the material waste potential. This will help economize the construction industry and improve its sustainability.

Originality/value

This is the first benchmarking study that quantitatively measures material waste in the construction industry of Pakistan. It highlights that costly as well as sustainability-implicating materials are frequently wasted in the local construction projects. Also, this study correlates the wastage with subcontracting arrangements. Additionally, an original conceptual WMP is proposed that could help the industry improve its performance. The findings could help the construction professionals identify the loopholes in their material management practices and not only save money but also ensure better sustainability.

Details

Engineering, Construction and Architectural Management, vol. 30 no. 6
Type: Research Article
ISSN: 0969-9988

Keywords

Article
Publication date: 25 September 2019

Nida Javed, Muhammad Jamaluddin Thaheem, Beenish Bakhtawar, Abdur Rehman Nasir, Khurram Iqbal Ahmad Khan and Hamza Farooq Gabriel

The formal application of project risk management (PRM) in green building projects is still an emergent part of project management. The purpose of this paper is to provide a…

Abstract

Purpose

The formal application of project risk management (PRM) in green building projects is still an emergent part of project management. The purpose of this paper is to provide a conceptual PRM framework that increases the probability of success in green building projects by minimizing unexpected events.

Design/methodology/approach

This paper interprets the related literature and uses the opinion of green building experts. It exposes some pertinent elements needed for structuring the PRM framework and suggests some mitigation actions for high-ranked risks. It also performs ex-post analysis on a case study to practically validate the proposed framework.

Findings

It is found that high initial cost, lack of experienced contractors and subcontractors, consideration of lifecycle inflation and experience in green building project management are the most significant risks. To address them, the framework proposes a rigorous selection of contractors, provision of financial incentives from the government, setting of a time buffer to accommodate legal process and development of a deliberate proactive financial model.

Originality/value

This paper contributes to the body of knowledge and practice by providing a reasonable strategy for employing the PRM framework capable of effectively managing risk in green building projects to keep organizations competitive within the business environment. The overall aim of this study is to contribute to the further development of the area of risk assessment and risk management from a knowledge-based perspective.

Details

Smart and Sustainable Built Environment, vol. 9 no. 2
Type: Research Article
ISSN: 2046-6099

Keywords

Article
Publication date: 13 March 2017

Fahim Ullah, Muhammad Jamaluddin Thaheem, Siddra Qayyum Siddiqui and Muhammad Bilal Khurshid

The purpose of this paper is to investigate the level of implementation of Six Sigma (SS) in the construction industry of Pakistan along with the current state of affairs and the…

2170

Abstract

Purpose

The purpose of this paper is to investigate the level of implementation of Six Sigma (SS) in the construction industry of Pakistan along with the current state of affairs and the challenges, and opportunities for a successful implementation.

Design/methodology/approach

The research is purely exploratory in nature. Based on published work, critical success factors are gathered, and a number of questionnaire surveys and interviews are conducted to refine and quantify their impact. A system dynamics framework to assess the SS influence on project success is developed and case study project are simulated.

Findings

The construction industry of Pakistan is still functioning in a traditional way; marred with low level of awareness and ad hoc approaches, the findings point to a huge improvement opportunity. Further, when under planning projects are exposed to SS, the chances of project success improve better than under execution projects.

Research limitations/implications

The limited level of awareness possessed by the respondents constrains the possible outreach of this work in industrially developed contexts. However, this work may become an impetus for further research in managing quality in construction industry.

Practical implications

The findings can be used to improve the quality provision of construction projects.

Originality/value

This work may trigger an important debate over the research and implementation of SS in the construction industry of developing countries that may greatly benefit by improving the quality of their projects and rectify their diminishing reputation for project success.

Details

The TQM Journal, vol. 29 no. 2
Type: Research Article
ISSN: 1754-2731

Keywords

Article
Publication date: 7 November 2016

Fahim Ullah, Bilal Ayub, Siddra Qayyum Siddiqui and Muhammad Jamaluddin Thaheem

The purpose of this paper is to investigate the critical decision factors of public–private partnership (PPP) concession which is complex due to a number of uncertain and random…

1431

Abstract

Purpose

The purpose of this paper is to investigate the critical decision factors of public–private partnership (PPP) concession which is complex due to a number of uncertain and random variables. To identify critical factors contributing to determination of concession period, this study reviews the published literature. It also identifies countries contributing most in PPP research. As a whole, it provides a mutually beneficial scenario by formulating a decision-making matrix.

Design/methodology/approach

This paper reviews the literature published during the period 2005-2015. A two-staged methodology is followed on retrieved scholarly papers: first, countries contributing to PPP are identified along with authors and affiliated institutions. Second, using frequency analysis of shortlisted critical factors, yearly appearance and stakeholders affected, a decision matrix is formulated.

Findings

The most contributing country toward PPP research is China, followed by the USA both in terms of country- and author-based contribution. In total, 63 factors are identified that affect PPP concession out of which, 8 per cent are highly critical and 21 per cent are marginally critical for decision-making.

Practical implications

Critical factors of PPP concession period will be identified with the help of decision-making matrix. This will help in adequate resource allocation for handling critical factors ensuring project success. Researchers may also understand the research trends in the past decade to usher ways for future improvements.

Originality/value

This paper reports findings of an original and innovative study, which identifies critical success factors of PPP concession period and synthesizes them into a decision-making matrix. Many of the previous studies have identified and ranked the critical factors but such a synthesis has not been reported.

Details

Journal of Financial Management of Property and Construction, vol. 21 no. 3
Type: Research Article
ISSN: 1366-4387

Keywords

Article
Publication date: 4 September 2017

Sana Azeem, Malik Asghar Naeem, Abdul Waheed and Muhammad Jamaluddin Thaheem

The purpose of this paper is to investigate the barriers inhibiting the adoption of green building and measures to promote this approach in Pakistan.

2954

Abstract

Purpose

The purpose of this paper is to investigate the barriers inhibiting the adoption of green building and measures to promote this approach in Pakistan.

Design/methodology/approach

Barriers and measures were identified and examined by using a combination of research methods, including literature review, questionnaire survey, and in-depth interviews with the construction industry-related practitioners working in Pakistan. Ranking technique and factor analysis were used to identify the significant issues associated with the adoption of green building practices.

Findings

As per the survey results, the most critical barrier is “lack of awareness among people about the importance and advantages of adopting green building practices,” followed by “lack of incentives from government” and “lack of green building codes and regulations,” respectively. The results also indicate that most important measure to promote the adoption of green buildings is “creation of public awareness toward green initiatives through seminars, workshops, and discussions,” followed by “availability of green building codes and regulations (mandatory to apply)” and “financial incentives and penalties by the government (e.g. soft loan, tax) for promoting green building practices,” respectively.

Research limitations/implications

Research limitation is that its findings, other than Pakistan, cannot be generalized to other developing countries.

Practical implications

Findings of the research will be helpful in sensitizing the regulatory agencies, the policy makers, and the building construction practitioners about the barriers to adoption of green building practices. The suggested measures will help in devising policies and economic measures to promote the construction of green and environment-friendly buildings.

Social implications

This research will help the common people to know about the importance of green buildings that may lead to a deviation from the practice of traditional buildings to a widespread trend of building green buildings. This will lead to drastic reduction in demand for energy and considerable monetary savings for the common people.

Originality/value

The findings of this study are expected to contribute valuable information to decision makers for the better understanding of key issues that call for more attention in the promotion of efforts of green building practices in Pakistan. The results are based on the perception of local stakeholders, but might also be helpful for policy makers in other countries.

Details

Smart and Sustainable Built Environment, vol. 6 no. 3
Type: Research Article
ISSN: 2046-6099

Keywords

Article
Publication date: 3 January 2020

Maria Ahmed, Muhammad Jamaluddin Thaheem and Ahsen Maqsoom

The purpose of this paper is to investigate critical barriers hindering the adoption of green supply chain management (GSCM) and the opportunities that can be exploited with such…

1212

Abstract

Purpose

The purpose of this paper is to investigate critical barriers hindering the adoption of green supply chain management (GSCM) and the opportunities that can be exploited with such an implementation in the construction industry of developing countries. It also devises strategies to avoid critical barriers in implementation and exploit opportunities for a better overall environmental performance of the construction industry.

Design/methodology/approach

This research relies upon an extensive literature review; data are collected from 163 professionals and 15 interviews of field professionals from 11 developing countries are conducted. The barriers and opportunities are synthesized through literature review and then data are collected over their significance from the construction professionals through an online survey. To highlight the interconnectedness of the critical barriers and opportunities, a causal loop framework is developed. Furthermore, expert opinion is sought to develop the strategies.

Findings

This research integrates information from different sources and provides a holistic view of the current situation of GSCM in developing countries. In total, 34 barriers and 23 opportunities are extracted from literature. The top 4 barriers fall under the “involvement and support” category, whereas the top four opportunities fall under the “environmental” category. Furthermore, the strategies to implement GSCM include suitable policies by top management to incorporate practices such as innovative green design, green procurement, green packaging, green distribution and even end-of-life management, which play a vital role in emission reduction.

Originality/value

This research is a first attempt at evaluating the barriers and opportunities facing GSCM in the construction sector of the developing countries. The findings encourage the stakeholders in adopting GSCM practices by presenting a clear picture of the potential benefits that can be exploited by implementing the proposed strategies to eliminate critical barriers in the construction industry.

Details

Benchmarking: An International Journal, vol. 27 no. 3
Type: Research Article
ISSN: 1463-5771

Keywords

Article
Publication date: 6 June 2016

Siddra Qayyum Siddiqui, Fahim Ullah, Muhammad Jamaluddin Thaheem and Hamza Farooq Gabriel

This paper aims at collecting and reviewing the published literature on the Six Sigma in construction along with its critical success factors (CSFs).

1968

Abstract

Purpose

This paper aims at collecting and reviewing the published literature on the Six Sigma in construction along with its critical success factors (CSFs).

Design/methodology/approach

The research is based on literature review. Based on the keyword and semantic search techniques, papers published on the topic of Six Sigma during 2000-2015 are retrieved. Frequency analysis is performed to find out significance of identified CSFs, and zoning is performed based on the product of frequency of appearance and parties affected by the CSFs.

Findings

A total of 69 CSFs are identified as published in the literature. Based on an inclusion criterion of minimum 15 appearances, 22 CSFs are shortlisted for further analysis. Of these CSFs, around 32 per cent fall into red zone (most critical), 50 per cent into yellow and 18 per cent into green zone (least critical).

Research limitations/implications

This work is limited by partial identification of CSFs. Though based on an extensive search, the retrieved CSFs may not be all the published ones. However, more thorough search techniques can be applied to improve upon this work.

Practical implications

The findings can be used to facilitate the decision-making in the context of project success.

Originality/value

This work is an original attempt at gathering Six Sigma CSFs applicable to construction projects. It may be used for further research and development to help ensure project quality and success.

Details

International Journal of Lean Six Sigma, vol. 7 no. 2
Type: Research Article
ISSN: 2040-4166